Paragon Structures (UK Ltd)

☰ Menu

Swimming

Case Study

Collingwood Centennial Aquatic Centre

Collingwood aquatic centre

The outdoor pool in Collingwood Ontario was built in 1967, and in 2013, was enclosed with a new high performance Sprung structure, allowing it to be used year-round. An additional accessible warm-water therapeutic pool was also added to enhance the facility. The pool is 25m long by 12m wide, with a water capacity of 540,000 litres. The Aquatic Centre is located in Heritage Park at the corner of Third and Spruce Street. (451 Third Street). It is operated by the Town of Collingwood Parks, Recreation and Culture Department.

A 27.4m wide x 64m long Sprung structure was erected in a 6 month timeframe and features a specially designed pool insulation system that performs extremely well in high humidity environments, while translucent daylight panels and sunshine doors add natural daylight to enhance the swimming experience.

Testimonials 
“Sprung Structures were a great solution: a unique, patented, energy efficient, ready to use structure to house our outdoor pool, allowing us to turn it into a four-season aquatic facility. We were also able to include a warm-water pool to replace a previous one that had been decommissioned.”

“Day-lighting roof panels to maximize natural light and eight insulated doors to allow for an open environment in favourable weather ensure the building is energy efficient. The positive aspects of an outdoor pool will not be lost. Our users have told us they are thrilled at the fact that they can continue their aquatic fitness programs throughout the winter! The Sprung Company has provided Collingwood with a showcase, state-of-the-art facility, which is the envy of many communities.”

Specific Uses

  • New accessible warm-water pool
  • Viewing room that overlooks both pools
  • On-Site Cafeterias
  • Interior spectator seating for 250 people
  • Multi-purpose room
  • Family change room
  • Daylighting roof panels to maximize natural light
  • Four insulated doors to allow for an open environment in favorable weather
  • HVAC system throughout the facility
5 Reasons to Choose Paragon

1

Engineered for High 
Moisture Environments
Enjoy the additional protection
of the insulation system of a high-performance pool building specially designed by Paragon.

2

Sunlight and a Bright, Welcoming Space
Daylight panels and glass walls allow natural light to illuminate interior spaces.

3

Solar Light Doors
Add even more natural light to interior environments with solar light doors, which can be open during warmer months to improve accessibility.

4

Superior Performing
Playing Environment
A game environment that is spacious and bright with a large ceiling height, fortified by a fully insulated inner membrane.

5

Rapid Construction
Schedule
Significantly reduce building costs and timelines compared to conventional pool building construction.

For specific information on how Sprung might meet the requirements of your next project, please click below.

Contact Us

Request a Quote






    Download Brochure

    Download a copy of our latest brochure here.


    Contact Us

    For general enquiries please fill out the contact form here.